The Supeks Hall, situated at SK Hynix's Icheon M14, possesses a unique allure. This hall has played the role of a primary auditorium for a long time and is designed with a fitting capacity of 453 seats to accommodate various operational needs of the users. Due to the users' relentless attention and effort, it remains immaculately maintained and continually showcases its modern upgrades.
To cater to various corporate seminars, meetings, as well as simple events and ceremonies, it is equipped with dual 18-inch subwoofers and dual 10-inch line array speakers. Additionally, to ensure audio clarity for the rear seats, column-type beam-steering delay speakers have been installed.
The 340-inch LED display is built with high-quality and stable devices to minimize time delays between equipment. Within the hall, several FHD high-resolution PTZ cameras and CCTVs are installed. Notably, the CCTV is designed with a highly durable SMPS for its power supply and is strategically located for easy access, ensuring a quick response in case of malfunctions.
The stage lighting blends both LED and halogen types, with a 48-channel dimmer installed for adjusting the lighting for the stage and the audience. The halogen lights, given their uncertain lamp replacement cycles based on usage, are susceptible to sudden failures. To preempt this, the AVStumpfl show controller monitors the lamp's usage time, offering users insights on when replacements are due and other relevant statistics.
To cover the vast space, Supeks Hall has incorporated a 5G wireless intercom system that supports multiple APs, effectively mitigating communication blind spots.